Step 1: Select Project & Week Ending
Employee View
Step 2: Create Auto Timesheet
Multiple Employees of the same type can be selected at once.
But they need to be of the same type or the system will return an error:
Once Selected, you can update the Start and Finish Time, The system will decompose the time based on the Project Variables and Rules
If no Variable exist for decomposition, the system will:
Step 3 (Optional): Create Manual Timesheet (Manual Overwrite)
To create a Manual Timesheet, a single Employee can be selected, and an Automatic Timesheet must have been created prior.
JCK Engineering PTE ©2022. All rights reserved.